國內(nèi)設(shè)備
設(shè)備,擁有多項(xiàng)
全國服務(wù)熱線:
0531-55555478
了解更多詳細(xì)信息,請致電
電話:0531-55555478
傳真:0531-88894779
郵箱:sdqyjnkj@163.com
Q Q: 506615608
或給我們留言
在線留言碳分子篩的更換是耗材問題的解決,考慮到制氮機(jī)工作上的特性,因此我們在進(jìn)行轉(zhuǎn)化的時(shí)候需要用到簡易的方法,下面就讓山東制氮機(jī)廠家的小編為你詳細(xì)介紹下制氮機(jī)是如何對碳分子篩進(jìn)行簡易轉(zhuǎn)化的?
The replacement of carbon molecular sieve is the solution to the problem of consumables. Considering the working characteristics of the nitrogen generator, we need to use a simple method when we carry out the conversion. Let's let the editor of Shandong nitrogen generator manufacturer introduce in detail how the nitrogen generator carries out the simple conversion of carbon molecular sieve?
1、電源被切斷。取代碳分子篩的制氮機(jī)運(yùn)行的前提是先切斷電源!記住這一點(diǎn)。停止供應(yīng)壓縮空氣,卸載制氮機(jī)系統(tǒng)內(nèi)部壓力,直所有壓力表歸零,并切斷系統(tǒng)電源。
The power was cut off. The prerequisite for the safe operation of the nitrogen generator replacing carbon molecular sieve is to cut off the power first! Remember this. Stop the supply of compressed air, unload the internal pressure of the nitrogen generator system until all pressure gauges return to zero, and cut off the power supply of the system.
2、卸下制氮機(jī)吸附塔的頂蓋,提前準(zhǔn)備好拆卸扳手!
2. Remove the top cover of the adsorption tower of the nitrogen generator and prepare the spanner in advance!
3、取下制氮機(jī)不銹鋼絲網(wǎng)!
3. Remove the stainless steel wire mesh of nitrogen generator!
4、工作完成后,加入3厘米厚的椰墊過濾,用直徑為5MM的氧化鋁在吸附塔底部預(yù)鋪5厘米厚,然后進(jìn)行碳分子篩裝填。
4. After the removal, add 3 cm thick coconut mat for filtration, pre lay 5 cm thick alumina with diameter of 5 mm at the bottom of the adsorption tower, and then carry out carbon molecular sieve loading.
5、填充頂部,用錘子或振動(dòng)設(shè)備振動(dòng)吸附塔,使碳分子篩之間的堆積密度達(dá)到620-640千克/立方米,更新頂部的椰墊和不銹鋼絲網(wǎng),覆蓋吸附塔的頂部,用長螺栓緊固常規(guī)位置,更新所有高于8.8的高強(qiáng)度螺栓。
5. Fill to the top, vibrate the adsorption tower with hammer or vibrating equipment to make the bulk density between the carbon molecular sieves reach 620-640 kg / m3, update the coconut mat and stainless steel wire mesh on the top, cover the top of the adsorption tower, fasten to the normal position with long bolts, and update all high strength bolts higher than 8.8.
6、復(fù)位后,調(diào)試制氮機(jī)。調(diào)試包括接頭肥皂水的泄漏檢測、工作狀態(tài)和性能指標(biāo)。請參考制氮機(jī)的操作說明!
6. After reset, debug the nitrogen generator. The debugging includes the leakage detection, working state and performance index of the joint soapy water. Please refer to the operating instructions of the nitrogen generator!
更多關(guān)于制氮機(jī)的訊息,歡迎登錄網(wǎng)址進(jìn)行詳細(xì)了解http://xingchangweb.com
For more information about nitrogen generator, please visit our website for more information http://xingchangweb.com
上一篇:購買螺桿鼓風(fēng)機(jī)應(yīng)該考慮的組成部分
下一篇:空壓機(jī)在打地?zé)峋淳械膽?yīng)用